South Fork Wind
Engineered Subsea Noise Mitigation
Scroll to explore ↓

SILENCE BY DESIGN
Weyres Offshore
Case Study: South Fork Wind
> WINDPARK // SOUTH_FORK_WIND
[ SITE METRICS & HARDWARE ]
PROJECT_NAME : South Fork Wind (US East Coast)
FOUNDATIONS : 13 Monopiles (12 WTG | 1 OSS)
PILE_DIAMETER : Ø 9.5 m - 10.0 m
MAX_IMPACT_ENERGY : 4,000 kJ
NOISE_MITIGATION : DBBC + AdBm Near-Field System
[ ACOUSTIC PERFORMANCE ]
NOISE_LEVEL_750M : 150 - 168 dB SEL (Limit: 169 - 175 dB SEL)
TOTAL_ATTENUATION : ~15 dB Noise Reduction
REAL_TIME_TUNING : +5 dB via on-site DBBC adjustment
ENERGY_SCALING : +3.0 to +4.3 dB per Energy Doubling
[ TELEMETRY & SENSORS ]
ARRAY_SETUP : 7 SAR Hydrophone Stations
MEASUREMENT_RANGE : 750 m - 10,000 m Radius
STATUS: DEPLOYMENT COMPLETE // 100% REGULATORY COMPLIANCE

01 // The Challenge: High-Energy Noise Mitigation
In offshore foundation installation, controlling underwater sound emissions is critical to meeting strict regulatory standards and protecting marine ecosystems. For the 13 massive steel monopiles (Ø 9.5–10.0 m) at South Fork Wind, kinetic impact energy reached up to 4,000 kilojoules. The requirement was clear: execute heavy foundation installation while maintaining 100% acoustic compliance.
By deploying the Big Bubble Curtain (BBC) as the primary noise mitigation system—operating in synergy with a near-field system—we established a proven acoustic barrier directly around the piling site
02 // Agile BBC Optimization
Effective noise mitigation requires more than static equipment; it demands operational adaptability on the water. We monitored acoustic propagation in real time using a 7-station subsea hydrophone array. When live telemetry from the first foundation (OSS) indicated room for performance optimization, our team acted immediately.
We re-engineered the inner and outer hose layout of the Double Big Bubble Curtain directly on-site. This rapid, data-driven adjustment delivered an additional ~5 dB of noise reduction for the remaining 12 turbine foundations, ensuring maximum acoustic margin throughout the campaign
03 // Verified results & acoustic performance
Data confirms that the integrated BBC deployment achieved full regulatory compliance with a substantial safety buffer:
-
Guaranteed Compliance Buffer: While regulatory noise limits were set between 169 and 175 dB SEL, actual measured levels were kept to a radically low 150–168 dB SEL at a 750 m distance.
-
15 dB Total Attenuation: The BBC configuration achieved ~15 dB of acoustic energy reduction compared to unmitigated European reference projects.
-
Controlled Acoustic Scaling: Even as hammer impact energy was doubled to maximum capacity, sound pressure increased by only +3.0 to +4.3 dB.

"Regulatory compliance isn't a gamble; it’s an engineered outcome. The data from South Fork proves our core operational strength: based on live telemetry, we analyze the situation and react immediately on-site. We have the capability to operatively adjust and optimize the Big Bubble Curtain (BBC) design on the fly. This agility, combined with the seamless synergy of complementary noise mitigation methods, guarantees 100% regulatory compliance—giving our clients full confidence during offshore execution."

Bernhard Weyres, Founder & CEO
Disclaimer:
The information, project data, and descriptions presented in this case study are based exclusively on publicly available sources and general industry knowledge. Due to strict confidentiality obligations and to protect the sensitive operational and trade secrets of our clients and partners, we are strictly prohibited from publishing or sharing confidential documents, project-related photographs, detailed technical drawings (such as specific DBBC Layout Drawings), or internal performance data that extend beyond what is publicly known. This case study serves purely illustrative purposes to demonstrate our technical expertise, general scope of work, and the applied methodologies (e.g., the Leapfrog strategy) in large-scale projects within the field of underwater noise mitigation . It does not constitute a binding offer or a detailed technical specification. We ask for your understanding that we are strictly bound by these confidentiality agreements in order to maintain the integrity and trust of our clients.